Container terminals are facing the challenge of reconciling increasing demands for emission reduction and shore power supply with efficient terminal operation.
Different ship sizes, variable berthing positions and the requirements of IEC 80005-1 place high technical and operational demands on the system.
Find out what challenges characterise modern projects and how flexible solutions enable a secure and future-proof ship connection.
Container terminals have different requirements for the integration of shore power. Limited space on the quay edge, existing terminal infrastructure such as bollards, fender systems, rescue ladders, flood protection systems, and operational processes usually require the development of individual solutions. With the igus Mobile Shore Power Outlet (iMSPO), various installation options are available that can be flexibly adapted to the respective individual conditions. Since there is no standard solution, our engineering team will be happy to support you with the planning.
This video shows shore power projects that have already been implemented in the Port of Hamburg and illustrates how the different requirements of the individual container terminals were successfully taken into account. Depending on the terminal, different integration concepts were used. From assembly on the front of the quay wall to elevated solutions. Today, igus mobile shore power systems are in daily operation, enabling flexible, safe and standard-compliant ship connection in accordance with IEC 80005-1 - without restricting the operational flexibility of the terminals.
The result: maximum connection flexibility, efficient terminal processes, and a future-proof shore power infrastructure for the requirements of today and tomorrow.
The requirements of IEC 80005-1 and the safe connection between ship and shore power (the so-called "connection dilemma") are among the central challenges of shore power projects
The IEC 80005-1 standard series defines the requirements for high-voltage shore connection (HVSC) systems and forms the basis for a safe and globally interoperable shore power infrastructure. The specific requirements for container ships are set out in Annex D. The annex defines key technical interfaces between the ship and the terminal and ensures that shore power systems can be planned, tested and operated in a standardised way worldwide. This ensures compatibility and operational safety.
Limited connection range due to cable outlets on the ship side
According to IEC 80005-1 Annex D, the cable management system for shore power supply of container ships is on board. The connection to the terminal is made via two heavy medium-voltage cables, which are lowered from the ship to the shore-side mounting point.
The standard specifies a minimum cable length of 10 metres on land. In practice, however, a considerable part of the available cable length is taken up by required bend radius as well as vertical movements due to tidal range, loading and unloading processes and changes in the ship's draught. Vertical movements of up to 20 metres are not uncommon.
In addition, the heavy weight of the medium-voltage cables, which are routed in pairs, makes handling difficult during the connection process and often requires the use of several employees.
The result is a very limited connection area along the quay wall. To be able to establish a shore power connection, the ship must be positioned within the range of the ship's own cables. This can restrict the free choice of berth and lead to compromises in handling and terminal operations.
Different positions of the cable outlets on container ships
The position of the cable management system (CMS) is not uniformly defined on container ships. Depending on the class and design of the ship, the outlet can be located at the stern, near the bridge, or at various positions along the longitudinal axis of the ship.
The differences between Panamax, Post-Panamax, New Panamax, and Ultra-Large Container Vessels (ULCV) are significant. Additional complexity arises from the possibility of berthing ships on both the port and starboard sides.
For terminal operators, this means that the position of the onshore connection point is not equally suitable for all ships. To cover the various CMS positions, either numerous fixed connection points are required along the quay wall or the shore power supply remains limited to specific ship types and berthing positions.
Both approaches increase investment costs and reduce the operational flexibility of the terminal.
Flexible use of berths
The efficient use of berths is a key success factor for container terminals. Ship size, schedules, crane availability in addition to waterside and landside operations determine the optimal berth.
Stationary shore power connection points can, however, restrict this flexibility. With the increasing number of ships that use shore power, the need for additional connection points along the quay wall is growing. Despite the high investment costs of their installation, they do not offer a long-term, future-proof solution.
The main question therefore is: why align ships with the shore power connection when you can bring the shore power connection to the ships?
Instead of aligning ships with fixed shore power connection points, igus brings the shore power connection to the ship.
Mobile shore power systems such as the iMSPO allow maximum flexibility along the quay wall and create the basis for a future-proof terminal infrastructure.
Find out more about the various configurations, integration options and technical versions of the iMSPO.
For years, ports and terminals around the world have relied on igus shore power supply solutions. From container and cruise terminals to applications at Ro-Ro terminals - our systems prove themselves daily under real operating conditions on all continents.
In person:
Monday to Friday from 7 am - 8 pm.
Saturdays from 8 am- 12 pm.
Online:
24h
WhatsApp-Service:
Montag – Freitag: 8 – 16 Uhr