My contact person
e-chains®, chainflex®, cables, harnessed systems readychain®

+381 11 63 098 17
Photo
dry-tech® bearing technology

+381 11 63 098 17
Photo

Assembly instructions for e-chain system® E4.1

E4.1 Assembly - joining two individual meter sections
E4.1 - Replacing an individual chain link in an assembled energy chain

Assembling e-chains® and E-Tubes

System E4.1 assembly Remove the cross bars from the first three links and then join them together at both ends.
System E4.1 assembly Assemble crossbars - Push down and snap in by using a screwdriver
System E4.1 assembly Assemble clips (e-chains® with crossbars every other link) - Push down and snap in
System E4.1 assembly Assemble E-Tube lids/bottoms - Attach to the connector at an angle - Snap in

Separating e-chains® and E-Tubes

System E4.1 disassembly Remove crossbars, clips, lids and bottoms at the outer links…
System E4.1 disassembly ...guide the screwdriver into the slot between side links and release it by levering …
System E4.1 disassembly ..remove the outer links to the side…
System E4.1 disassembly ...and separate the e-chain®

Opening e-chains®

System E4.1 assembly Remove crossbars - Insert screwdriver into the slot, push down, release by lever action
System E4.1 assembly Remove clips - Insert screwdriver into the slot and push down, release by lever action

Opening E-Tube

System E4.1 assembly Remove lids/bottoms - Insert screwdriver into the slot, release by lever action
System E4.1 assembly Release only one side to swivel the lid!